View Map
The Project corridor takes off from junction of Alwar Delhi road on Alwar bypass and joins NH-11 at Sikandra. The Project road is a part of SH-25 for its total length of 81 Km. Development of the approach road to Abhaneri, a tourist place, has also been taken up. Length of the approach road is 4 Km. As such, total length of the project road is 81 Km. The road stretch passes through the districts of Alwar and Dausa. Major towns’ enroute are Rajgarh and Bandikui.
Benefits: The project road caters to vehicles travelling from Delhi, Bhiwadi, Gurgaon and Alwar to Kota and the southern part of the country. The vehicles travelling from Alwar to Kota save about 70 Kms of travel length resulting in savings of time and fuel.
Length |
81 Kms |
Configuration |
2-Lane with Paved Shoulder |
Toll Plazas (2 Nos) |
|
ROBs (4 Nos) |
|
Bypasses (3 Nos) |
|